Tel No. 400-827-6866

Gold CIP Production Line

Gold CIP Production Line

Process Description

Xinhai gold EPC project in Sudan mainly adopt the method of carbon absorption. This method adsorbs gold from cyaniding pulp by active carbon including 7 steps: leaching pulp preparation, cyaniding leaching, carbon acid adsorption, gold loaded carbon desorption, pregnant solution electrodeposit, carbon regeneration, leaching pulp, which received a high recovery rate of 92.5%.

Gold CIP Production Line
Gold CIP Production Line

Smelting of gold CIP production line

After simple pickling and impurity removal, the gold ingots are obtained.

Desorption electrolysis system with high efficiency, low energy consumption and fast

Under the high temperature and pressure, this system has advantages of no cyanide, automatic controlling, high efficiency, fast and low energy consumption.

High Efficiency: When the grade of gold loaded carbon reaches 3000g/t, desorption rate can reach more than 96%.

Fast: due to the high temperature and pressure, the time of desorption electrolysis is 12 hours shortened by 50-70%

Low energy consumption: due to the same temperature and fast working, the energy consumption is 1/2-1/4 of regular system

No cyanide: without adding NaCN in desorption solution, low cost and no pollution

 

Gold CIP Production Line

Process Flow

Gold CIP Production Line

Jaw Crusher is widely used in mining, building materials, chemical industry, metallurgy, highway and railway, water conservancy and so on.Xinhai as famous jaw crushers manufacturer will provide suitable jaw crusher price and machine selection for you.

Guestbook

Please leave your message here! We will send detail technical info and quotation to you!

* Products:

Materials: <labelLead

Capacity :
* Name :
* Email :
Location :
* Tel :
Message :
;